Community evidence comparison ·
Moorlands district and community comparison
What the new records clarify and what families still need answered.
Northshore's new records answer some earlier requests. The central question remains: how would the same school program fit and cost at Moorlands and Arrowhead after recreation, access and other constraints are treated consistently?
This is an independent community summary of the reviewed report. District estimates, community calculations and unanswered questions are identified separately. Missing material in this review is not proof that it does not exist. Sources were reviewed November 4, 2026.
Download the full report (PDF · 9 pages · 121 KB)Land and recreation
Compare usable land using the same assumptions
District record: The November 2 deck counts 12.39 district-owned acres at Arrowhead and 6.93 at Moorlands. It includes Moorlands' purchased parcels: 5.90 acres described as ready for school use and 1.03 requiring City approval. It says a Moorlands replacement must fit its own field and play area, while Arrowhead's field, playground and trees remain. The scenario webpage still starts with roughly 5 versus 12 acres. [D9, pp. 18, 38] [D6]
| Measure | Arrowhead | Moorlands |
|---|---|---|
| District-owned land, November 2 deck | 12.39 acres | 6.93 acres |
| Community screen below 15% slope | 7.31 acres | 6.52 acres |
| Community screen below 5% slope | 4.15 acres | 4.17 acres |
Community method: Reserve a modeled 2.17 acres for Arrowhead's recreation functions and exclude the city park from Moorlands' district acreage. Existing buildings and circulation remain in these screens. These are terrain estimates, not certified vacant or net buildable acres. Thresholds are cumulative; do not add the rows. [C1]
The posted park agreement supports school-hours use and scheduled ballfield priority, preserves public use and provides a termination process. Exclusive school use of the entire park and a fully signed current agreement with all amendments remain unverified. [D8]
Question: Why must Moorlands replace its current park-supported recreation on district land, and what common recreation standard applies at Arrowhead? Publish equivalent layouts and a City-supported explanation of future park access and parcel approvals.
Annual savings
A complete cost bridge is still needed
District model: The workbook lists about $1.379 million in Moorlands annual closing-school savings after its 5% reduction. It also models added staffing at Arrowhead and Woodmoor. [D2]
| Annual change, rounded | Case A | Case B |
|---|---|---|
| Closing-school savings after 5% reduction | $1.379 million | $1.379 million |
| Less receiving-school staffing | $0.298 million | $0.380 million |
| Community calculation of modeled net | $1.081 million | $0.999 million |
Case A uses projected 2028 resident enrollment. Case B uses October 2026 enrolled full-time equivalents plus incoming resident pockets. These are model cases, not a statistical confidence range. Calculations use full native precision before rounding; this is not the districtwide scenario total. [D2, Closing!D21; S1 Receiving!AB6:AB7, AB16:AB17]
Costs not separately priced: Transportation changes, one-time closure and transition, added receiving-school custodial or utility costs, assistant-principal changes, repurposing costs or revenue, and escalation beyond 2026–27. The workbook says the 5% reduction generally covers some exclusions; ask which costs and amounts. Classroom teachers and planning are excluded on both sides because they follow students. Special education, English-language services, Title I and LAP are not modeled. [D2, Summary!A16:A17; Notes!A8:A11]
The model counts about $295,783 annually in Moorlands utilities, facility-manager and custodian savings after the reduction. The November 2 deck proposes using Moorlands for Shelton View in 2028–2030 and later rebuilds. Reconcile which operating costs continue, move with Shelton View or are avoided. [D2, Closing!D27] [D9, p. 19]
Request: A yearly ledger through the first post-2030 reuse period, separating recurring savings, transition and capital costs, continued occupancy costs and documented avoided accommodation costs. Apply the same ledger to an option retaining Moorlands.
Transportation
The model shows benefits and new burdens
District estimates: 199 current Moorlands walkers would become bus riders to Arrowhead, with modeled rides of 14–17 minutes AM and 14–22 minutes PM. Typical and average existing rides fall from 27 to 25 minutes; the longest south-group ride falls from 39 to 38 minutes. Arrowhead's longest rides rise from 26 to 30 minutes AM and 32 to 38 minutes PM. Combined morning and afternoon routes increase from 17 to 18. [D3, p. 1]
Limits: Estimates use current 2026–27 students and exclude traffic. The 199 walkers are not the 233 projected 2028 residents assigned to Arrowhead. AM plus PM route totals do not count unique buses or driver positions. Shorter existing rides do not measure the loss of a walking option.
Request: Implementation-year routes with traffic, arrival and dismissal queues, safe walking access, and itemized driver-hour, mileage, fleet and reimbursement changes. Connect the cost to the savings model's 5% allowance.
Facilities and safety
General condition and seismic results both matter
| Measure | Moorlands | Arrowhead |
|---|---|---|
| Building condition score (higher is better) | 63.02 / 100 | 55.96 / 100 |
| Facility Condition Index (lower is better; both Poor) | 0.46 | 0.49 |
| 2025–2029 corrective-action planning total | $13.98 million | $4.89 million |
| Scoped seismic result | Higher-Level Structural Risk | Lower-Level Structural Risk; passed checks |
| Recommended seismic upgrade planning estimate | $5.49 million, buildings A–D | No upgrades recommended in this study |
What this establishes: Moorlands has the better general condition score and FCI, but a higher corrective-action total and recommended seismic upgrades. Both neighborhood-school and swing-site use need to address the seismic findings. [D4, pp. 55, 206, 486–487, 503]
Limits: The main assessment excludes the separate seismic costs and describes rough-order estimates as plus or minus 100%. The Moorlands seismic cost sheet is marked DRAFT. Covered play areas, covered walkways and nonacademic buildings were excluded from the seismic study. These are planning estimates, not bids or interchangeable rebuild prices. Adding the totals does not establish definitive closure savings. [D4, pp. 9, 19, 486–487, 503]
Request: Engineer-reviewed scopes for each proposed occupancy, removing completed work, reconciling overlaps, and using common price years, useful lives and phasing.
Capacity and swing space
Compare the same pupils and programs in every option
District measure: The enrollment workbook defines design capacity as classrooms multiplied by 22.5, listing 765 at Moorlands, 518 at Arrowhead and 833 at Woodmoor. That does not independently establish usable capacity for actual programs, services, childcare, lunch, buses or portables. [D5]
The 2028 resident forecast lists 438 for Moorlands without the proposed change. The scenario webpage lists 463 at Arrowhead and 686 at Woodmoor after south rebalancing. Workbook inputs reproduce 463 at Arrowhead, but 486 + 203 = 689 at Woodmoor; reconcile that three-student version difference. Residents, enrolled headcount and full-time equivalents are different measures. [D5] [D6] [D2, S1 Receiving!D6:E7]
The November 2 deck recommends Moorlands for Shelton View's 2028–2030 swing use and future rebuilds; the FAQ says the destination is undecided. A recommendation can precede a decision. The FAQ's more-than-$20-million modular swing-site estimate is an alternative capital estimate, not annual operating savings attributable to Moorlands. [D9, p. 19] [D7]
Community request: Price three complete choices—the district proposal with Moorlands swing use, an alternative retaining Moorlands with a real Shelton View solution, and no south change using the district's Canyon Creek/Woodmoor temporary split option. Use equal educational, transport, access and building-work standards.
Records that resolve the differences
Six questions for the district
What fits at each campus under the same standards?
Publish dimensioned comparative layouts for the same student program: buildings, recreation, buses, parents, parking, drainage, trees and grading. Distinguish gross land from the permitted building envelope. [D9] [C1]
Why does the park change the Moorlands requirement?
Provide the fully signed park agreement, current amendments, use maps and a City-supported explanation of access, school-hours priority, termination and rebuild conditions; include the church license and parcel approval pathway. [D8] [D9]
What is the full annual and multiyear net saving?
Provide editable models, source costs, staffing allocations, exclusions, positions actually removed, swing-use operating costs, avoided accommodation costs and reconciliation of the 5% allowance. [D2]
Will transportation and receiving campuses work in practice?
Publish implementation-year routes with traffic, aggregate stop and ride assumptions, queue analysis, safe walking access and incremental transportation costs. [D3]
What capital work is required for each proposed use?
Provide current condition and seismic work status, engineer-reviewed occupancy scopes, schedules and comparable estimates. Reconcile overlaps and price years; include swing occupancy and a retain-Moorlands option. [D4]
Which classrooms and services support the capacity claim?
Provide room-level capacity and program maps, permanent and portable inventory, projected attending enrollment, a resident-to-attending bridge, grade-level staffing and special-service and childcare plans. [D5]
The district's published timeline plans a written closure analysis for November 23, 2026, first reading February 22, 2027 and vote March 8, 2027. Dates may change. Ask for these records early enough for public review. [D10]
Sources and methods
PDF page references count the cover as page 1. The full report provides exact worksheet references, additional source notes and sensitivity results.
- D1 · District enrollment and boundaries data index
- Index for the new public spreadsheets and reports.
- D2 · Closure Net Savings All Scenarios, posted November 2
- Closing!D4:D21, D25:D27; S1 Receiving!AB6:AB7, AB16:AB17; Summary!A2, A5, A16:A17; Notes!A3:A11. Full precision used before rounding.
- D3 · EDAC Scenario Transportation Summaries v3
- PDF p. 1, South Rebalancing Transportation Summary, October 2026, including traffic and cohort footnote.
- D4 · Northshore facilities assessment, Final R1
- April 25, 2025. PDF pp. 55 and 206 (printed 48 and 199): condition summaries; pp. 9 and 19: scope and uncertainty; pp. 486–487: seismic memo; p. 503: draft Moorlands estimate.
- D5 · Resident Projections to 2030 All Grades
- Sheet1!B3:C5, B17:C17, B24:C24: capacity and acreage; I5, I17, I24: 2028 residents; A51:A54: source notes.
- D6 · Scenario 2: Close Moorlands and Sunrise
- South section: acreage narrative, receiving-school residents and capacity.
- D7 · District enrollment and boundaries FAQ
- Property sale and Shelton View temporary-location questions. Neither the FAQ nor a recommendation is a final Board decision.
- D8 · 2018 City of Kenmore–Moorlands Park agreement
- PDF pp. 2–4, sections 5 and 7; pp. 24–25, Exhibit F, sections 1.2–1.5. Reviewed posted copy does not establish a fully signed current agreement and every amendment.
- D9 · Moorlands Community Presentation Slides, November 2, 2026
- Community-supplied district deck, 46 pages. PDF pp. 18 and 38: sites; p. 19: swing use and no-south-change option. No public district download URL was located in this review. Retained file SHA-256 begins 7991b1ecf8edb5a3.
- D10 · District process and timeline
- Written analysis, recommendation and Board-vote milestones; subject to updates.
- C1 · Community terrain and recreation method
- November 2 analysis: 2021 USGS King County bare-earth elevation (WA_KingCounty_2021_B21), county parcels and Kenmore 2026 aerial imagery; 4-foot grid in EPSG:2926. Modeled Arrowhead recreation reservation totals 2.1682 acres; only overlap with each cumulative slope class is deducted. Moorlands includes district parcels and excludes the city park. Existing roofs and circulation remain. Trees, setbacks, wetlands, soils, access, drainage, construction phasing and design require further review. An 8-foot sensitivity case gives 4.22 / 4.30 acres below 5% and 7.40 / 6.62 below 15% (Arrowhead / Moorlands), demonstrating that hundredths are not survey precision. This screen neither proves Arrowhead infeasible nor certifies a Moorlands rebuild. See report p. 9 for input service links.
Download the complete nine-page comparison · Explore district sources and community research